peye105 asked:


We have a 2 acre lot with existing well, septic and electric. We have a $100,000 budget and are considering stick built and prefab options. I’m new to the building committee and not sure where to start???

Glass Storefront Doors
http://steelbuildingbulletin.com/wp-content/plugins/sociofluid/images/digg_48.png http://steelbuildingbulletin.com/wp-content/plugins/sociofluid/images/stumbleupon_48.png http://steelbuildingbulletin.com/wp-content/plugins/sociofluid/images/twitter_48.png
D W asked:


i already have the main pond, and now adding a waterfall, prefab pieces,
how do i hook the pump up and add tubing to make the whole thing work?

Metal Building Accessories
http://steelbuildingbulletin.com/wp-content/plugins/sociofluid/images/digg_48.png http://steelbuildingbulletin.com/wp-content/plugins/sociofluid/images/stumbleupon_48.png http://steelbuildingbulletin.com/wp-content/plugins/sociofluid/images/twitter_48.png
  • Pages

  • Categories

  • Archives